Mainroom Lighting Plot

Click to download PDF (2.3mb)

First Avenue Lighting Patch Sheet

Upstage Truss (Line B)

12-elation arena par zoom (5 ch. mode)
  start ch.01,06,11,16,21,26,31,36,41,46,51,56.

4-elation satura spot cmy (33 ch. mode)
  start ch.121,154,187,220.

2- 250 w acl bar
  start ch 377,378.

1-radiance waterbase haze (2 ch.)
  start ch.401,402.

Downstage Truss (Line B)

12-elation arena par zoom (5 ch.mode)
  start ch.61,66,71,76,81,86,91,96,101,106,111,116.

Midstage Truss (Line C)

2-elation satura spot cmy (33 ch.mode)
  start ch. 01,34

6-elation platinum wash zfx pro (42 ch.mode)
  start ch.67,109,151,193,235,277

Dance Floor Grid (Line A)

6-elation ww profile leko (1 ch.mode)
  start ch.01,06,11,16,21,26.

8-elation rayzor q12 zoom ( 28 ch.mode)
  start ch.31,59,87,115,143,171,199,227.

4-etc par can
  start ch.271,272,273,274.

4-pinspot
  start ch.283,284,285,286.

amdj disco light 7ch.
  start ch.275.


UPDATED 1/1/16